跳至主要内容

Oil Filled Power transformer oil system

Oil-immersed transformer have several separate oil systems. When the oil-immersed transformer is running, the oil in these independent oil systems is not interrelated, and the oil quality and operating conditions are different. Gas chromatographic analysis of oil should be done separately to determine whether there are potential faults or not.

oil immersed transformer tank wall folding machine
oil immersed transformer tank wall folding machine

1.Main internal oil system of Oil-immersed transformer.

The oil system connected with the oil around the winding is the main internal system, including the oil in the cooler or radiator, the oil in the oil storage tank, and the oil in the oil injection casing of 35kV and below.
When injecting transformer cooler oil, the gas drain plug stored in the oil system must be released. Generally speaking, each of the above components should have its own gas drain plug. The main internal oil plays the role of insulation and cooling.
Transformer Oil can also increase the electrical strength of insulating paper or insulating cardboard. In vacuum oil injection, if some parts can not bear the same vacuum intensity as the main tank, temporary gate isolation, such as the gate valve between the tank and the main tank, should be applied. The head of the submersible pump on the cooler should be enough to avoid suction of air due to negative pressure. The oil system should have a protective system of pressure relief devices to eliminate the pressure generated by the failure of the body.

2.Oil in switching switch room of on-load tap-changer.

This part of the oil has its own protection system, namely flow relay, oil storage tank, pressure relief valve. The oil in the switch room acts as insulation and extinguishing current. Transformer Oil will go into the oil produced when the switch cuts off the load current. The oil system should have good sealing performance, even if the arc pressure is generated during the switching process, it should also protect the sealing performance.
Although the oil in the switching switch chamber of on-load tap changer is separated from the oil in the main body, in order to avoid damaging the seal of the switching switch chamber during vacuum oil injection, the oil in the main body should be injected in vacuum at the same time. When vacuum oil is injected, the two systems should have the same vacuum degree, and if necessary, the oil storage tank of the system should be separated during vacuum pumping.  For the convenience of the structure, the main oil storage unit and the oil storage tank of the switching switch room are designed as an isolated whole.

3.Fully sealed at voltage levels of 60 kV and above.

The main function of this oil system is to insulate, or to increase the electrical strength of insulating paper in oil capacitive bushing. When injecting oil into the main body, the terminal of casing end should be sealed well to prevent air intake.

4.Oil in high-pressure outlet box or point gas outlet box.

The high voltage output line of three-phase 500kV Oil-immersed transformer passes through corrugated insulation oil isolation system. This oil system mainly acts as insulation. In order to simplify the structure, the oil system can also be connected with the main internal oil system through connecting pipes or designed as a separate oil system.

5.Oil-immersed transformer insulation test

When conducting various insulation tests on Oil-immersed transformers, the first step is to exhaust gas and release the possible stored gas through the exhaust plug. Potential faults can be predicted by analyzing the gas chromatographic analysis of oil in each system. Every oil system must meet the operation requirements, such as the change of oil volume when absorbing oil expanding and contracting, the valve for oil discharge, the gas release plug, the isolation valve between cooler and radiator and main oil tank, etc. Each oil system has good sealing performance. The oil in the switching switch room of on-load tap-changer should be replaced independently without releasing the main body oil. When transporting, the main body oil can be released and filled with dry nitrogen.

Oil-immersed Transformer Corrugated Fins Cooler Wall Manufacturing Related Machines:

Automatic Corrugated Fins Wall Manufacturing Line

Corrugated Fins Wall Forming Machine


corrugated fins wall making machine

Full-auto PLC Corrugated Fins Seam Welding Machine


corrugated fins wall seam welding machine

Hydraulic Decoiler


steel roll feeding machine
hydraulic steel roll holding feeding machine


Corrugated Fins Wall Leak Testing Machine


transformer tank corrugated wall leakage test machine
transformer tank corrugated wall leakage test machine
corrugated fin wall leakage test machine

Want to know more?(Marketing Title)

Phone: 008615195010186
Email: cnkylt@aliyun.com

评论

此博客中的热门博文

KYLT ACS aluminum frame by CNC machining, Precision CNC machining

KYLT One-Stop  CNC Machining Service  Including Custom Finishing Service. On-demand manufacturing,  Machining Metal  & Plastic Parts  Materials. FREE quotation. Parts In As Fast As 1 Day. What is the Advantages of Choose KYLT  CNC Machining services ?  Ability to produce custom-made metal CNC machining parts, CNC machined part with high precision, delivery in time, CHEEP price, FREE quotation, MOQ 1PCS. Over 10 kinds of plastic and metal machining. KYLT provide various types of CNC machining services no matter what your demands or requirements are. We can deliver parts in as fast as 24 hours.  CNC machining service offering instant quotes on high precision custom parts. KYLT CNC manufacturing network provides machined prototypes and mass production. All kinds of plastic, metal Fixture (jig, tooling) making service. CNC quote with FREE, custom parts delivered in time.Rapid C NC prototypes making  and  Precision CNC ma...

The advantages of Casting Iron parts used in Corrugated fins forming machine

The advantages of Casting Iron parts used in Corrugated fins forming machine (JTFY 400-1300 TRANSFORMER OIL TANK CORRUGATED FINS FORMING MACHINE KEY MECHANICAL STRUCTURE ALL USE STANDARD GB QT500 CASTING PARTS) Main casting iron structures: ---①②③④⑤ are key casting iron parts Material:Standard GB QT500 --① right&left gantry posts --② slider box --③ slider bottom platen --④ back platen post --⑤ post of cutting structure --other casting iron parts: oil cylinder flange, roller seat, movable mould bearing support,front&back loose-tight structure foot parts etc. transformer oil tank corrugated fins forming machine Casting Iron is naturally weathered. The casting iron part is much heavier than the welding part. The corrugated fin forming machine is one kind of heavy machinery. The smaller vibration of the machine , the greater of cutting precision. The sensitivity of casting iron to vibration is very low, so that its cutting accuracy is improved. Castin...

SCREW THREAD MACHINING METHOD

In  Metal parts machining  works, screw thread (tapping) be required. The screw thread is mainly divided into: connecting thread and driving thread For  connecting thread , the main  machining  methods are: tapping, threading, turning, rolling, etc. For  transmission thread , the main  machining methods  are: rough and fine turning – grinding;whirlwind  milling  – rough and fine  turning , etc. CNC turned screw thread part The following describes the various screw machining methods: THREAD CUTTING Generally, it refers to the method of machining thread on workpiece with forming tool or grinding tool, mainly including  turning , milling, tapping, threading, grinding and whirlwind cutting, etc. THREAD MILLING On the thread milling machine, the disc milling cutter or comb milling cutter is used for milling. Disc  milling  cutter is mainly used for milling trapezoid external thread of screw rod, worm and o...