KYLT Electronic radiator by aluminum CNC machining

Used in computer, electrical control systems. Electronic radiator made by  aluminum CNC machining . FREE QUOTATION MOQ 1PCS 40-60% CHEAPER THAN OTHERS Rapid Tooling &Plastic Injection Molding Service Will Cater All Your Needs. One-Stop Service Include Rapid Tooling, Rapid Prototypes & Low Volume Production, Instant Online Response, Chinese workshop directly. Rapid C NC prototypes making  and  Precision CNC machining  service that meets your most stringent requirements. CNC quote with FREE, custom parts delivered in time. KYLT  CNC Machining Service  Including Custom Finishing Service. On-demand manufacturing, Machining Metal &Plastic Parts Materials.Parts In As Fast As 1 Day. Factory Price, Wide Range Of Products, Quality Assured, Effective Sourcing. Get A Free Manual quotation, Instant Quote Online by Files:   +008615195010186 cnkylt@aliyun.com High-Quality  Rapid Prototypes making  &  Fixture, Jig...

Oil filled transformer test & trial operation

After Oil immersed transformer be installed, we should do testing works as follows: 1. Telemetry of insulation resistance: (1) Telemetry project, high pressure to low pressure and ground (shell), low pressure to high pressure and ground (shell) (2)Select 2500V megohm meter, the appearance of megohm meter should be good, complete shell, flexible shake handle, no long resistance pointer, no glass damage. (3) Open circuit test of megawatt-hour meter, separate two pens, shake the handle of megawatt-hour meter up to 120 y/min, the needle pointing to infinite (∞) is better. Short circuit test: shake the handle of megawatt-hour meter, overlap two than instantaneous, the needle pointing to “0” (zero), indicating that megawatt-hour meter is normal. (4) Qualified value: at 20℃+, the new transformer is not less than 450 MΩ, and the operation is not less than 300 MΩ. This value should not be reduced by 30% compared with the previous value. (5)Absorption ratio R60/R12 should be 1.3 tim...

Inspection Work before Distribution Transformer Installation

Distribution Transformer Installation:   When   Distribution Transformer   is delivered to work place, what inspection works should be done before installing. Which inspection should be made before Distribution Transformer Installation? 1. Distribution Transformers will suffer great vibration after long-distance transportation, and need to be inspected. The inspection of transformer body is divided into suspension core and suspension cover. No matter the core or hoods, the contents of inspection are consistent. Inspection of suspension core should be completed within one working day to speed up the inspection process. 2. As an example of the hanging core inspection : (1) Transformer suspension core should be carried out indoors, if there should be a tent outdoors, to prevent rain, snow, fog, sand and other bad weather prohibition suspension core. (2) In winter, the temperature of suspension core should not be lower than zero, otherwise, the temperature of ...

Reasons and Solutions for Transformer Tank Painting Problems

In   Transformer tank   painting works, we will have the problems,such as:pin-holes,bubbling,orange skin,cracking etc. Today, we will analysis the defect reasons and how to solve the problems. Painting Sticky of Transformer Tank 1. Phenomenon: After drying, some or all of the adhesive marks occur on the coated transformer tank surface. 2. Reasons: (1) Too much slow-drying solvent is added to the paint, the solvent can not volatilize; (2) insufficient or no curing agent is added; (3) the oil tank coating surface is polluted; (4) the climate changes sharply during painting processes, painting in rainy season and high humidity; (5) the coating is too thick, the interval between layers is insufficient, the paint film is not dry. 3. Countermeasure: (1) Choose appropriate dry solvent, and do not excessively add; (2) add curing agent in proportion; (3) keep the coated surface free from pollution; (4) ensure good ventilation during construction in adverse ...