Prevent works in Transformer using process

Transformer prevent works in using:

1. Preventing oil leakage:

  • Oil-immersed transformer is filled with transformer oil in the tank, which is sealed by pressing oil-resistant rubber components with fasteners in assembly.
  • Imperfect sealing is the main cause of transformer oil leakage, so special attention should be paid in maintenance and maintenance.
  • Whether the small bolt has been loosened by vibration or not, if loosened, it should be tightened, the tightening degree should be appropriate, and should be consistent everywhere.
  • Whether the rubber is broken or seriously deformed. At this time, the rubber parts can be updated. When replacing, attention should be paid to the consistency of their models and specifications, and keep the sealing surface clean.

2. Preventing dampness of transformer:

Transformer is a high-voltage equipment, which requires good insulation performance. Oil-immersed transformer is very susceptible to damp. Preventing damp is one of the main measures to maintain transformer.
For this reason, users should pay attention to the following matters:
  • after the purchase of transformers, the power supply bureau should be asked to do the hand-over test immediately;
  • the humidifier should be installed immediately, and the capacity of transformers at 100 KVA and above are equipped with the humidifier.
As soon as the transformer arrives at the site, it is necessary to install a humidifier immediately to prevent the internal body from dampness. Monitor the silica gel in the moisture absorber and replace it immediately after damp. The silica gel in the moisture absorber can absorb moisture and protect transformer. After wet and saturated, the color of silica gel changes, and a new dry silica gel needs to be replaced.
When ordering, attention should be paid to minimizing the storage time of transformer before power transmission. After the transformer is manufactured, it is easy to be damped during storage. The longer the storage time, the more serious the dampness is. Therefore, the plan should be well arranged and the storage time should be shortened as far as possible.
Small transformer with capacity of 100 KVA or less, without hygroscopic device. The oil in the oil pillow is easy to get damp, and the oil pillow accumulates water. Oil in transformer oil pillow has been seriously damped if it has been stored for more than six months without power supply or has been put into operation for more than one year.
If you want to carry out lifting transportation, maintenance refueling, oil valve discharging, suspension core and other work, you should first through the oil plug under the pillow to discard the dirty oil in the pillow, and wipe and seal with a dry cloth, so as not to make the dirty oil in the pillow into the tank. In the operation of transformer, we should pay attention to the changes of oil level, oil temperature, voltage and current. If there are abnormal conditions, we should analyze and deal with them in time.
When installing transformers, it is strictly forbidden to use aluminium strands, aluminium bars, etc. to connect with copper guide rods of transformers so as to avoid corrosion of guide rods.

3. Transformer oil exchange and drying treatment:

transformer idle too long, running too long or other natural and human factors, resulting in transformer insulation decline, internal water intake or deterioration of oil quality and other phenomena, at this time must be transformer oil exchange and drying treatment.

How to change Transformer oil:

  • First hang out the body, put the dirty oil and wash the tank, if there is oil dirt on the body, it should also be cleaned.
  • When the body is dried, new oil is injected and all oil-resistant rubber seals are replaced.
  • Only after the transformer be test, it can be connected to the power network.

Transformer drying treatment:

there are many drying methods for the body. Users can use zero-phase sequence drying method, eddy current drying method, short-circuit drying method, oven drying method and so on.
For transformers with large capacity and voltage of 35 KV, it is better to send them to manufacturers for vacuum drying. In this way, the transformer insulation can be thoroughly dried without aging.

Transformer Tank Cooling Wall Production line:

Automatic Corrugated Fins Wall Manufacturing Line


CORRUGATED FIN FOLDING AND WELDING MACHINES

Corrugated Fins Wall Forming Machine


corrugated fins wall making machine

Full-auto PLC Corrugated Fins Seam Welding Machine


corrugated fins wall seam welding machine

Hydraulic Decoiler


steel roll feeding machine

Corrugated Fins Wall Leak Testing Machine


corrugated fins wall leakage testing machine

Want to know more?(Marketing Title)

Phone: 008615195010186
Email: cnkylt@aliyun.com

评论

此博客中的热门博文

The advantages of Casting Iron parts used in Corrugated fins forming machine

The advantages of Casting Iron parts used in Corrugated fins forming machine (JTFY 400-1300 TRANSFORMER OIL TANK CORRUGATED FINS FORMING MACHINE KEY MECHANICAL STRUCTURE ALL USE STANDARD GB QT500 CASTING PARTS) Main casting iron structures: ---①②③④⑤ are key casting iron parts Material:Standard GB QT500 --① right&left gantry posts --② slider box --③ slider bottom platen --④ back platen post --⑤ post of cutting structure --other casting iron parts: oil cylinder flange, roller seat, movable mould bearing support,front&back loose-tight structure foot parts etc. transformer oil tank corrugated fins forming machine Casting Iron is naturally weathered. The casting iron part is much heavier than the welding part. The corrugated fin forming machine is one kind of heavy machinery. The smaller vibration of the machine , the greater of cutting precision. The sensitivity of casting iron to vibration is very low, so that its cutting accuracy is improved. Castin...

KYLT ACS aluminum frame by CNC machining, Precision CNC machining

KYLT One-Stop  CNC Machining Service  Including Custom Finishing Service. On-demand manufacturing,  Machining Metal  & Plastic Parts  Materials. FREE quotation. Parts In As Fast As 1 Day. What is the Advantages of Choose KYLT  CNC Machining services ?  Ability to produce custom-made metal CNC machining parts, CNC machined part with high precision, delivery in time, CHEEP price, FREE quotation, MOQ 1PCS. Over 10 kinds of plastic and metal machining. KYLT provide various types of CNC machining services no matter what your demands or requirements are. We can deliver parts in as fast as 24 hours.  CNC machining service offering instant quotes on high precision custom parts. KYLT CNC manufacturing network provides machined prototypes and mass production. All kinds of plastic, metal Fixture (jig, tooling) making service. CNC quote with FREE, custom parts delivered in time.Rapid C NC prototypes making  and  Precision CNC ma...

sell automotive parts die casting machine

Automotive Parts Die Casting Machine used to make aluminum engine shell, housing, cover, pully, bracket, steering wheel, steering stents, padle, electric box, light heatsink, lamp housing, bus reflector bracket etc. Email: cnkylt@aliyun.com Automotive Parts Die Casting Machine  mainly used to manufacture aluminum alloy parts for cars, buses,turck and electric vehichles. The aluminum products applications from enginer spare parts to electric system. Brake wires with zinc terminal  also is an important in automotive manufacturing process. Vertical hot chamber die casting machine  with mold used to cast zinc shaped structure with wire ropes. L type vertical machine is traditional version with semi-auto operation. T type vertical machine have more spaces in front and back sides, can be connect with auto wires feeding machine and pick-up machine, cutting machine to reach full automatic working. Why Aluminum alloy is popular used in automotive industry? Die Casting Machines can...