Transformer Cooling Oil treatment methods:
1. Pressure filtration method: Insulating oil for power transformer must have insulation and thermal conductivity (national standard) at the installation site. Pressure filtration method is commonly used to complete the general drying (removing moisture) and purification (removing dirt) of insulating oil.
2. Open valves 8 and 11, then start the oil pump, and then open valves 6 and 7. When shutting down, shut down 6 and 7 first, then shut down the oil pump, and then shut down the valves of 8 and 11.
In normal operation, the pressure gauge works normally under the pressure of 3*10~4*10 Pa. If impurities and oil paper are blocked, the pressure will increase. When the pressure reaches 6*10 Pa, the filter paper must be stopped and replaced.
The filter paper is dried for 24 hours in an oven at 80-90℃ before use and placed in a clean container.
The filter screen is cleaned every 10-15 hours. At the beginning, the oil is filtered for 3-5 minutes. The outlet hole is sent back to the dirty oil tank through the valve 10 for re-filtration. The oil in the filter is stored and sent back to the dirty oil system through the valve 9 for re-filtration.
The above oil filter should be carried out several times until the essence and drying are qualified.

transformer cooling oil
transformer cooling oil

3. Filter Transformer cooling oil with power:
(1) When the voltage is higher than 10V, it is not advisable to use live oil filter. Because there are more bubbles in the process of filtration, the bubbles will be free under the action of higher voltage, which will deteriorate the insulation performance of oil and lead to internal discharge. The gas released from the oil in the gas relay is regularly discharged during live oil filtration.
(2) When electrified oil filter, the oil pipe and oil filter should be grounded reliably to protect the personal safety of the staff. The staff should be professional, be monitored and wear good insulating articles.
(3) Operation: 4 and 5 diagonal valve joints, connected with pressure filter buckle, valve 4 extracts oil, from the valve 5 back to the tank, through a number of cycles of filtering, until meeting the standards.

Oil filled Distribution Transformer Corrugated Tank Wall Manufacturing Related Machines:

Automatic Corrugated Fins Wall Manufacturing Line


CORRUGATED TRANSFORMER TANK WALL FOLDING AND WELDING MACHINES
CORRUGATED TRANSFORMER TANK WALL FOLDING AND WELDING MACHINES

Corrugated Fins Wall Forming Machine


transformer corrugated fins cooling wall folding machine
transformer corrugated fins cooling wall folding machine

Full-auto PLC Corrugated Fins Seam Welding Machine



Hydraulic Decoiler machine


hydraulic steel roll feeding machine
hydraulic steel roll feeding machine


Corrugated Fins Wall Leak Testing Machine


oil leakage test machine for transformer cooler wall
oil leakage test machine for transformer cooler wall

Want to know more?(Marketing Title)

Phone: 008615195010186
Email: cnkylt@aliyun.com

评论

此博客中的热门博文

SIMPLIFIED DRAWING METHOD FOR MECHANICAL DRAWING

When design  machine parts  /  prototypes  by 2D engineering method, we can adopt simplified drawing method: 1.When the object ( mechanical part ) has several identical structures (teeth, slots, etc.) and distributes according to certain rules, only a few complete structures need to be drawn. The rest are connected by fine lines, and the total number of structures is indicated. Mechanical part  Examples of Simplified Drawing of Mechanical Drawings : Examples of Simplified Drawing of Mechanical Drawings for Same Structure and Simplified Drawing Same Structure and Simplified Drawing 2.A number of holes with the same diameter and regular distribution (round holes, screw holes, sinks, etc.) can be drawn only one or several, the rest can only be represented by the center line, and the total number of holes should be indicated when the size of holes is marked in the figure. Simplified Drawing Method for Regularly Distributed Holes Simplified Drawing ...

WHY SCREW THREAD CAN NOT PASS THREAD GAUGE INSPECTION

After the first metal part be tapped, we always to check it: if pass the thread gauge inspection? The inspection result is OK, we can do mass production. If it fails, We should consider which reasons cause tapping faiulre. KYLT provide Metal Machining services for:  WEDM, EDM, DRILL, TAPPING ,  CNC LATHING ,  CNC MILLING ,  ALUMINUM / MAGNESIUM / PLASTIC RAPID PROTOTYPES MAKING . 1PCS ORDER IS ALLOWED. Aluminum CNC machined workpiece Normally, the following reasons may cause screw thread faiulre: 1) UNQUALIFIED TAP Tap is wear or bad 2) QUALIFIED DRILLING HOLE (BEFORE TAPPING) If the hole is too small, because of friction, will increase the difficulty of tapping, while tapping faster wear, and vice versa, the hole is too big, it can easily tap into, but the quality of teeth is very poor, because the diameter of teeth will become larger, relative to the screw nut bonding force is insufficient, easy to slide teeth. In M3 *0.5, the correct hole (general i...

CNC MILLING: DOWN MILLING &UP MILLING

CNC milling  process adopt  Down milling  or  Up milling ? Which milling method is better? Down Milling & Up Milling Definition Down milling:  refers to the cutting speed direction of the cutter is the same as the moving direction of the workpiece. Up milling : refers to the direction of cutting speed opposite to the direction of movement of the workpiece. CNC milling work, How to distinguish Down Milling and Up Milling. WHEN MILLING WORKPIECE OUTLINE: Clockwise feeding and programming along the outline of the workpiece is Down milling. Counterclockwise programming and feeding along the outline of the workpiece is Up milling. WHEN MILLING THE INNER CONTOUR OF THE WORKPIECE: Clockwise feeding and programming along the inner contour of the workpiece is downmilling. Counterclockwise programming and feeding along the inner contour of the workpiece is reverse milling. CNC UP & DOWN MILLING CHARACTERISTICS OF DOWN MILLING AND UP MILLI...